GN Seattle Terminal

   Brian Morgan's GN Seattle Terminal

Lower Level Plan

Upper Level Plan
The GN Seattle Terminal is an N-Scale layout with two levels. The upper level represents Seattle’s King Street Station and south, while the lower level is GN’s Balmer Yard. This layout is a terminal operation, 100% within yard limits.
When you report for your evening shift you’ll be a swing man working the list. Your in charge of a switching crew, assigned to switch one or more switching zones. The evenings work will be listed on one or more switch lists. You’ll also have a PICL book, ProtoThrottle and a single EMD GP7 locomotive to get your work done. If some of that does not make sense not to worry, there will be a short orientation to get you up to speed. .